Stage 2 Construction:
Stage 2 Construction commenced in mid-June with the mobilization of heavy equipment by Dahle Construction for the transportation route upgrades and the establishment of a crusher facility to produce aggregate required for these upgrades. Stage 2 Construction will also consist of development and construction of the following: cobalt ore mill and concentrator (approx 7700 ft elevation), water treatment plant, maintenance shop and storage area, aerial tram unloading terminal, tailings and waste rock storage facility, soil stockpile, water management ponds, ram portal bench, ram portal, aerial tram loading terminal and hydrometallurgical facility.Q1 2013 - New Concentrate Processing Business at Refining Complex Photos
Q4 2012 Photos:
Q3 2012 Photos:
Q2 2012 Photos:
Q1 2012 Photos:
December 2011 Photos:
November 2011 Photos:
October 2011 Photos:
September 2011 Photos:
August 2011 Photos:
July 2011 Photos:
June 2011 Photos:
Stage 1 Construction (completed):
Stage 1 Construction consisted of timber clearing for the tailings and waste rock storage facility, the soil stockpile, site roads, and mill and concentrator pads. The contract was awarded to Dahle Construction, LLC of Salmon, Idaho. Approximatley 125 acres of timber have now been cleared.